A white two-storey house with timber louvres and a paved forecourt under mature trees
Architecture and interiors, Brisbane

Homes and workplaces drawn for the climate.

Houses, clinics, cafes and offices that stay cool without fighting the weather.

Process

Five stages, each with a date on it.

Fees and timelines
  1. 01

    Brief

    1 to 2 weeks

    We walk the lot, measure, and write a one-page brief you sign before we draw.

  2. 02

    Concept

    3 to 4 weeks

    Two plan options with a massing model and a cost band each. You pick a direction.

  3. 03

    Design development

    6 to 10 weeks

    Full drawings, structural coordination, interiors, and the energy report that gets you to the star rating the Code now asks for.

  4. 04

    Approvals

    10 to 20 weeks

    A development application to the council where the City Plan needs one, then building approval through a private certifier, with the character overlay and the flood report dealt with before anything is lodged.

  5. 05

    Construction

    9 to 16 months

    Builder selection from QBCC licensed tenderers, weekly site visits, progress claims reviewed, and the defects list at practical completion.

Drawing sheets, a scale rule and a pot of pencils on the studio table
The studio

Five people, one floor above Latrobe Terrace.

Founded in 2016. Someone from the studio stands on every site each week, and the cost estimate at design development is the number we hold ourselves to.

66
projects since 2016
11,600sqm
designed and built
5
people, one on every site weekly
About the studio

"We asked for a house we could live in without the aircon running all day. Three years in, the living room has never needed it."

The Escaño family, The Gap Courtyard House